West Valley Central

Mother reading to young son

aps

Voltage - 230kV
Estimated completion date - 2023
Location - El Mirage, AZ


apswestvalleycentral.com

Project need
New electrical infrastructure is needed to provide clean and reliable electric service to a new data center customer in the City of El Mirage and support the continuing economic growth and development in the West Valley.

Project description

We have completed our public siting process and have identified our preferred routes for these separate 230kV transmission connections, from the Contrail substation to locations shown on the map below, which was submitted as part of our application to the Arizona Corporation Commission (ACC) for a Certificate of Environmental Compatibility (CEC).

Approved Routes/CEC

A multi-day public hearing before the Arizona Power Plant and Transmission Line Siting Committee was held during the week of February 28th, 2022, at the Glendale Civic Center, and received unanimous approval to grant APS a CEC of the preferred routes. The case for the approval of the CEC was later presented in an Open Meeting of the Arizona Corporation Commission on April 12, 2022, and received their vote of approval for the CEC.

Project maps
Jurisdiction Map
Jurisdiction Planning Map
Study Area Map
Existing Land Use Map
Future Land Use Map
Approved Corridor Map


Project features
This connection project will feature steel monopole (single pole) structures that are typically used for new 230kV transmission lines, but may include a variety of structure types, ranging in height from approximately 115 feet to 195 feet tall depending on routing, terrain and crossing of existing structures, including elevated roads and other power lines.

Project input
Although the public siting process is now complete, open house material and information can still be viewed online at the apswestvalleycentral.com. Comments or questions can be submitted to:   

Public information open house
Launch date: Tuesday, October 20, 2020
Attend online: apswestvalleycentral.com


Contact information
Lupe Martinez
Siting Consultant 
wvc230kV@aps.com

Related documents
Newsletter #1
Newsletter #2
Newsletter #3
Visual Simulations
Project Overview
Prefiling Transcript
Prefiling Exhibit 1
Prefiling Exhibit 2
Prefiling Exhibit 3
Prefiling Exhibit 4
Application
Prehearing Exhibit 1
Prehearing Exhibit 2
Prehearing Exhibit 3
Prehearing Transcripts
Hearing Transcripts 1
Hearing Transcripts 2
Hearing Transcripts 3
CEC #198

Power line siting projects
A look at the current siting projects, as well as some completed siting projects.
PlaceHolder
Copyright © 2024 APS.  All rights reserved.
Current server address is 10.20.64.98