To prioritize reliability and meet substantial growth in residential and commercial energy needs, APS has developed a future-focused Strategic Transmission Expansion (STX) portfolio. APS also files a ten-year transmission plan with the Arizona Corporation Commission (ACC) each year.

The STX projects represent a significant upgrade to our transmission system.

  • Support growing energy needs — New transmission lines expand our capacity to serve increasing customer energy needs and our ability to deliver energy where it is needed.
  • Strengthen reliability — New lines will strengthen reliability for customers and improve the resilience of the grid. In some areas, new transmission lines will replace lines that have reached the end of their design lives.
  • Connect to new resources — New and upgraded transmission lines increase capacity, allowing us to connect to additional generation resources and procure more cost–competitive energy for customers through the wholesale power market. These lines bring more energy into our service territory and support our diverse resource mix.

Current Strategic Transmission Projects

Sunset over the southwest valley

Cotton Transmission Corridor

Se necesitan nuevas líneas eléctricas de 230 kilovoltios (230kV) y 500 kilovoltios (500kV) para mejorar la infraestructura eléctrica y realzar la confiabilidad para clientes actuales y futuros de APS en la región oeste del condado de Maricopa.
Boys loading the dishwasher

Proyecto de Mejora Eléctrica de Pinal

Para satisfacer las crecientes necesidades energéticas de más personas y empresas en toda el área de Casa Grande, buscamos actualizar nuestro sistema. 

Conoce más arrow dropdown