Up-Front Incentives for Off Grid Wind Energy Systems

New wind systems installed within the APS service territory and which are not tied to the APS grid can compete for a one-time incentive from APS of up to $1.80 per Watt DC, up to a maximum incentive of $75,000. Systems requesting greater than $75,000 may apply for an incentive under our production based incentive program. Total up- front incentive payments are also limited to 50 percent of the cost of the system.

The score given to an off grid wind project is largely based on the per kWh incentive that is being requested for each kWh of production your system is estimated to provide (i.e. the kW size of your system multiplied by the kWh per installed kW it produces).

The maximum incentives per kWh available under the program vary by technology and are listed on the APS Incentive Chart. When applying for an incentive, you may request the maximum incentive per kWh available, however projects requesting less incentive per kWh of production will generally receive a more competitive score. Available funding will be equally divided into the six bi-monthly allocation periods as noted below. Applications are due the last business day of the respective period.

  • January and February
  • March and April
  • May and June
  • July and August
  • September and October
  • November and December

Because we typically receive requests for more funding than we have available, it is likely that not all projects will be funded in any given period. Also, since this is a competitive process, “winning scores” changes each period based on the volume and scoring of applications we receive. While we cannot give any specific guidance regarding competitive scoring, we do publish the cutoff scores from the most recent period (meaning every project receiving funding had a score equal to or lower than the score published).

Before you apply:

Steps in the incentive process:

  1. Submit a completed and signed Reservation Application - Off Grid Wind which includes:
    • A project description and an itemized quote for all system and installation costs. The quote must include the manufacturer and model number of the system equipment.
    • Your UFI Ranking Score from the APS ranking calculator.
    • A copy of the signed installation contract between you and your chosen installer (the contract can be contingent on receiving APS funding). Applications that are submitted without a signed installer contract will not be accepted.
        
  2. Approximately two weeks after the nomination period has ended, the cutoff score for that period will be posted on aps.com/GoSolar and projects receiving a funding reservation will be notified. If accepted, APS will send you a Credit Purchase Agreement (CPA) which you must review, sign and return within 45 days. The CPA is the document that spells out the obligations between you and APS regarding the renewable energy credits (RECs) associated with the production from your system and must be signed in order to participate in the program.
      
  3. Provide “proof of advancement” of system within 60 days of receiving notification of your incentive to show the installation is moving forward. This will include final system design, copies of equipment orders and status of local permitting where applicable. 
  4. Obtain any local permits and proceed with installation of your system.
    Typically your installer will assist you in obtaining permits for the construction of your system. After installation, your local jurisdiction will inspect your system and provide any municipal clearances (also called "green tags") which must be submitted to APS.
     
  5. Request your incentive payment from APS.
    After your system has been activated, please send the following to APS so that your incentive payment may be processed.

Submit all program documents by e-mail: commercial-renewables@aps.com

If you have any questions regarding the process, please call (602) 328-1924.

 

Forms & Resources
Contact APS Interconnect  |  Renewable Energy Home