Site Ready Checklist

Please use the checklist below to ensure site is ready for APS to proceed with installation of  electric facilities.

  • Lot lines and corners have been staked
  • Locate all customer installed underground facilities (i.e. sprinklers, well water lines, septic tanks, retention areas, etc.)
  • Underground facilities have been staked within 2 feet of their location along the cable route
  • Underground cable route has been cleared of all obstructions
  • Grade stakes have been set along the route marked to indicate final grade
  • Cable route has been filled or cut to within 6” of final grade